PV farm Drzonowo with the power of 849,96 kWp.
The project involved the following:
- LV cable lines (0,4 kV)
- DC wiring of PV modules
- installation of DC/AC inverters
- monitoring system of PV installation
- anti-shock protection
- anti-overvoltage protection
- design works
The plant consists of 3148 modules with the power of 270 Wp produced by HANPLAST, arranged in 9 rows of PV panels. The modules are installed on the base construction produced by CORAB, WS-OO7.
PV panels are serviced by 18 HUAWEI inverters with the power of 40kVA. The electricity produced is delivered to MV 15kV network of ENERGA OPERATOR through the MV/LV transformer station. The connection to the power grid is located on the of pole 15kV.
The investment was completed in cooperation with Milarys, Hanplast and Corab companies.