PV power plant Turowo with the power of 899,92 kWp.
The project involved the following:
- LV cable lines (0,4 kV)
- DC wiring of PV modules
- installation of DC/AC inverters
- monitoring system of PV installation
- anti-shock protection
- anti-overvoltage protection
- design works
The plant consists of 3214 modules with the power of 280 Wp produced by HANPLAST, DC wiring, LV and MV electrical installations and a transformer station with the connection to the power grid. The modules are installed on the base construction produced by CORAB, WS-OO7 – tilt angle of the panels 25 degrees. PV panels are serviced by 20 HUAWEI SUN2000-36KTL inverters with the power of 40kVA. In order to monitor the work of inverters and the quantity of electricity produced, we introduced a solution allowing for communication through the lines empowering individual inverters. Communication and monitoring of the installation by SmartLogger 2000 from Huawei.
The devices of the PV farm are connected to the container transformer station of 15kV. The station is powered by grid connection from the MV pole 15kV. The electricity produced by the plant is delivered to MV 15kV network of ENERGA OPERATOR.
The measurement system of net electricity is located on the side of MV (15kV) and the measurement system of gross electricity produced is located on the side of LV (0,4kV).
The investment was completed in cooperation with Milarys, Hanplast and Corab companies.